WHAT DO I DO NOW?
- Firstly you need a bore. If a new bore ensure that the drilling contractor determines the sustainable production rate. If you have an existing bore you may need to arrange a pump test if you are unsure of its capacity.
- A feedwater analysis is required. Please refer to our Product info page to download a form to have a sample analysed. Instructions are on this page.
- You will need to have an idea of how much water you require. The units operate continuously so some storage helps even out high demand periods.
- Contact Aqueous Solutions to discuss your application and requirements.
- We will then organize a site visit or for a larger sample to be sent for more detailed testing.
- After this a quotation can be provided.
You will need to supply for your installation:
- Bore or feed supply.
- Shed to house the unit with power supply and concrete floor.
- Reject disposal.
- Storage tanks as specified.



